Home Remodeling & Home Services Cost Estimates
ITEM | QUANTITY | LOW | HIGH |
---|---|---|---|
|
1 compactor | $371.43 | $434.78 |
|
2.1 hours | $53.55 | $97.15 |
|
1 compactor | $14.55 | $24.25 |
|
$19.40 | $24.25 | |
|
1 compactor | $458.93 | $580.43 |
Average cost per compactor | $458.93 | $580.43 |
To Replace Trash Compactors in Sheppard Afb you should expect to pay in the range of $458.93 to $580.43. What we use to calculate Sheppard Afb Trash Compactor Replacement estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Trash Compactor Replacement in Sheppard Afb project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
The average cost to Replace Trash Compactors in Sheppard Afb 2025 is $458.93 to $580.43 per compactor. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Sheppard Afb Trash Compactor Replacement projects always make sure to receive project estimates from several contractors.