Let a mason in Kermit give you an estimate on your project Request a FREE Quote

What are the prices for limestone sealing in Kermit WV?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Limestone Surface Labor
Direct labor expenses to seal limestone.
3.4 hours $100.91 $185.71
Limestone Surface Job Materials and Supplies
Cost of supplies that may be required to seal limestone including: fabrication and polishing disposables, manufacturer recommended underlayment, fasteners, adhesives and surface sealants.
200 square feet $34.63 $38.80
Total Cost to Seal Limestone Surfaces
215 square feet $135.54 $224.51
  Average cost per square foot $0.68 $1.13

This is an estimate. You can get an accurate quote for your project from a Kermit concrete and masonry pro.

Cost to Seal Limestone Surfaces - 2025 Cost Calculator

To Seal Limestone Surfaces in Kermit you should expect to pay in the range of $135.54 to $224.51. What we use to calculate Kermit Limestone Sealing estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Limestone Sealing in Kermit project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Limestone Sealing in Kermit

The average cost to Seal Limestone Surfaces in Kermit 2025 is $0.68 to $1.13 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Kermit Limestone Sealing projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Limestone Sealing in Kermit

  1. Direct labor costs to Seal Limestone Surfaces in Kermit - between $100.91 and $185.71.
  2. Cost of all materials and supplies which may be necessary for Limestone Sealing , which may include: - between $34.63 and $38.80.

What the Kermit Limestone Surface Sealing Estimate Includes:

  1. Costs associated with worksite preparation for the Limestone Sealing in Kermit project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Kermit materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Limestone Sealing projects.

What the Limestone Surface Sealing Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Kermit building department.
  2. West Virginia and Kermit sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Kermit Limestone Sealing project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services