To Install Concrete Block Wall Caps in Center Barnstead you should expect to pay in the range of $606.69 to $676.27. What we use to calculate Center Barnstead Concrete Block Wall Cap Installation estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Concrete Block Wall Cap Installation in Center Barnstead project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per linear foot for Concrete Block Wall Cap Installation in Center Barnstead
The average cost to Install Concrete Block Wall Caps in Center Barnstead 2025 is $24.27 to $27.05 per linear foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Center Barnstead Concrete Block Wall Cap Installation projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Concrete Block Wall Cap Installation in Center Barnstead
- Non-discounted retail costs for 26 feet of Block Wall Cap Installation - between $94.15 and $100.86.
- Direct labor costs to Install Concrete Block Wall Caps in Center Barnstead - between $110.24 and $122.45.
- Cost of all materials and supplies which may be necessary for Concrete Block Wall Cap Installation , which may include: - between $347.75 and $376.57.
- Costs of specialty equipment used for efficiency and job quality, which may include: - between $54.56 and $76.39.
What the Center Barnstead Block Wall Cap Installation Estimate Includes:
- Costs associated with worksite preparation for the Concrete Block Wall Cap Installation in Center Barnstead project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Center Barnstead materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Concrete Block Wall Cap Installation projects.
What the Block Wall Cap Installation Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Center Barnstead building department.
- New Hampshire and Center Barnstead sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Center Barnstead Concrete Block Wall Cap Installation project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.