Let a landscape architect in Fulks Run give you an estimate on your project Request a FREE Quote

What are the costs for pond digging in Fulks Run VA?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Pond Labor
Direct labor expenses to dig pond.
24.2 hours $1,101.76 $1,156.41
Pond Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: skid loader with excavation | demolition | loading attachment..
$156.41 $221.89
Total Cost to Dig Ponds
215 square feet $1,258.18 $1,378.30
  Average cost per square foot $6.30 $6.89

This is an estimate. You can get an accurate quote for your project from a Fulks Run landscaping pro.

Cost to Dig Ponds - 2025 Cost Calculator

To Dig Ponds in Fulks Run you should expect to pay in the range of $1,258.18 to $1,378.30. What we use to calculate Fulks Run Pond Digging estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Pond Digging in Fulks Run project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Pond Digging in Fulks Run

The average cost to Dig Ponds in Fulks Run 2025 is $6.30 to $6.89 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Fulks Run Pond Digging projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Pond Digging in Fulks Run

  1. Direct labor costs to Dig Ponds in Fulks Run - between $1,101.76 and $1,156.41.
  2. Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.

What the Fulks Run Pond Digging Estimate Includes:

  1. Costs associated with worksite preparation for the Pond Digging in Fulks Run project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Fulks Run materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Pond Digging projects.

What the Pond Digging Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Fulks Run building department.
  2. Virginia and Fulks Run sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Fulks Run Pond Digging project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services