Let a painter in Killdeer give you an estimate on your project Request a FREE Quote

What are the prices for baseboard painting in Killdeer ND?

Home Remodeling & Home Services Cost Estimates

linear feet

ITEM QUANTITY LOW HIGH
Basebord Labor
Direct labor expenses to paint baseboards.
2 hours $61.06 $106.61
Basebord Job Materials and Supplies
Cost of supplies that may be required to paint baseboards including: masking tape and paper, surface repair material, solvents and cleanup supplies.
50 linear feet $24.25 $38.80
Total Cost to Paint Baseboards
54 linear feet $85.31 $145.41
  Average cost per linear foot $1.71 $2.91

This is an estimate. You can get an accurate quote for your project from a Killdeer painting pro.

Cost to Paint Baseboards - 2025 Cost Calculator

To Paint Baseboards in Killdeer you should expect to pay in the range of $85.31 to $145.41. What we use to calculate Killdeer Baseboard Painting estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Baseboard Painting in Killdeer project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per linear foot for Baseboard Painting in Killdeer

The average cost to Paint Baseboards in Killdeer 2025 is $1.71 to $2.91 per linear foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Killdeer Baseboard Painting projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Baseboard Painting in Killdeer

  1. Direct labor costs to Paint Baseboards in Killdeer - between $61.06 and $106.61.
  2. Cost of all materials and supplies which may be necessary for Baseboard Painting , which may include: - between $24.25 and $38.80.

What the Killdeer Baseboard Painting Estimate Includes:

  1. Costs associated with worksite preparation for the Baseboard Painting in Killdeer project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Killdeer materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Baseboard Painting projects.

What the Baseboard Painting Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Killdeer building department.
  2. North Dakota and Killdeer sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Killdeer Baseboard Painting project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services