Let a floor contractor in J B P H H give you an estimate on your project Request a FREE Quote

What is the price for subfloor framing in J B P H H HI?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Subfloor Labor
Direct labor expenses to frame subfloor.
32.6 hours $1,390.96 $1,508.89
Subfloor Job Materials and Supplies
Cost of supplies that may be required to frame subfloor including: fasteners and connectors.
200 square feet $1,095.19 $1,185.98
Subfloor Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: pneumatic framing nailer, 12" miter saw and 3 1/4" electric planer.
$27.65 $46.56
Total Cost to Frame Subfloors
215 square feet $2,513.79 $2,741.43
  Average cost per square foot $12.57 $13.71

This is an estimate. You can get an accurate quote for your project from a J B P H H flooring pro.

Cost to Frame Subfloors - 2025 Cost Calculator

To Frame Subfloors in J B P H H you should expect to pay in the range of $2,513.79 to $2,741.43. What we use to calculate J B P H H Subfloor Framing estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Subfloor Framing in J B P H H project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Subfloor Framing in J B P H H

The average cost to Frame Subfloors in J B P H H 2025 is $12.57 to $13.71 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on J B P H H Subfloor Framing projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Subfloor Framing in J B P H H

  1. Direct labor costs to Frame Subfloors in J B P H H - between $1,390.96 and $1,508.89.
  2. Cost of all materials and supplies which may be necessary for Subfloor Framing , which may include: - between $1,095.19 and $1,185.98.
  3. Costs of specialty equipment used for efficiency and job quality, which may include: - between $27.65 and $46.56.

What the J B P H H Subfloor Framing Estimate Includes:

  1. Costs associated with worksite preparation for the Subfloor Framing in J B P H H project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local J B P H H materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Subfloor Framing projects.

What the Subfloor Framing Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the J B P H H building department.
  2. Hawaii and J B P H H sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the J B P H H Subfloor Framing project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services